Monthly Archives - August 2022

Pacific Park, 595 Dean St, Brooklyn, NY

eFlow Constant Airflow regulators are installed at 595 Dean Street, a two-building mixed-income, mixed-use redevelopment project situated in Brooklyn, NY. The  complex is currently under construction and will yield a total of 798 units between the 23-story West Tower and 28-story East Tower. Residences will offer studio, studio alcove, one-bedroom, and two-bedroom layouts, with 240 homes designated for affordable housing. The development will also contain 72,600 square feet of public open space, ground-floor retail area, a 455-car parking garage. eFlow-Constant Airflow Regulators were...

Read more...

Highgarden Tower, 11 Garden St, New Rochelle, NY

The Highgarden Tower will feature eFlow-CAR assemblies for automatically balanced ventilation system! The Highgarden Tower, located at 11 Garden Street  is one of the most recent mixed-income developments on the rise in New Rochelle, NY. This 100 percent affordable, 19 story residential tower will yield 219 rental units ranging from studios to three-bedroom homes. A total of 77 units will be reserved for victims of domestic violence. eFlow-CAR  4" at 25/50 CFM in 6"x6" wall mount assembly with thin-line fire dampers will be...

Read more...

202 East 23rd Street, New York, NY

eFlow is proud to be part of another Passive House project! Construction in underway at 202 East 23rd Street in NYC.  This slim 108 unit, 20-story residential rental tower is being built to Passive House standards and will feature eFlow-Constant Airflow Regulator assemblies. 3” CAR at 15/25 CFM and 4” CAR at 45 CFM will be installed utilizing 6”x6” CAR mounting plates for supply application. eFlow-CAR wall mount assemblies with thin-line fire dampers will be used for exhaust application. This assembly will...

Read more...

200 Winston Drive, Cliffside Park, NJ

200 Winston Towers  is a 31-story, luxury high-rise building in Cliffside Park, New Jersey. This 676 Unit building was originally built in 1973. It has recently undergone significant upgrades including the installation of eFlow-Contant Airflow Regulators. The project was motivated by PSE&G energy efficiency funding. The project scope was a total replacement of the corridor make up air units for the building and installation of eFlow-CAR’s for controlled airflow supply. eFlow-CAR 6” at 150 CFM, eFlow-CAR 8” at 295 CFM and...

Read more...

Microsoft Campus, Redmond, WA

Microsoft took  on  a significant initiative to modernize Redmond campus encompassing 3 million square feet of new workspace and amenities. This modernization includes  the installation of eFlow-MAX high capacity constant airflow regulator for automatically balanced ventilation, high indoor air quality and energy efficiency. eFlow-Maxs are installed  in restrooms, janitor closets and garage. Redmond has been the home of the Microsoft Corporate Campus for the last 33 years. The Refresh project that is currently underway replaces 12 older office buildings with approximately 3...

Read more...

171 North 1st Street, Brooklyn, NY

eFlow-Constant Airflow Regulators installed at 171 North 1st Street, Brooklyn, NY. The new seven-story building located in the heart of Williamsburg neighborhood offers 57 apartment units, with seventh-story penthouses and three townhouses among them, measuring an average of 842 square feet. All apartment exhausts feature eFlow-CAR 4" for automatically balanced ventilation system. eFlow-CAR wall assemblies were installed for fresh air supply.   Developer Gemini Rosemont Development Services acquired the site for $18.2 million in April 2020 and teamed up with Broadway Construction Group for this project. Fogarty Finger Architects  is listed on permits as...

Read more...